Raw pet food specialist shop in Hampshire

Hem & Boo Sports Training Long Lead

by

Price range: £21.00 through £27.00

Sports Training Long Lead – Hem & Boo

Give your recall training a serious upgrade. The Sports Training Long Lead – Reflective is crafted for confident training sessions, active recall practices, and walks with added freedom—without losing control or safety.

Build Strength You Can Trust

Made from tightly woven nylon, this lead delivers the perfect balance of strength and flexibility. It handles pull and distance work with ease while keeping its sporty look intact.

Visibility You Can Rely On

With reflective accents, this lead enhances visibility during dawn and dusk training or walks. Stay safe and seen in all conditions.

Master Recall, Safely

Available in generous lengths—5 m, 10 m, and 15 m—this lead gives you flexible control during recall practice or obedience drills.

Training-Ready Design

Designed for reactive pups, working breeds, or everyday pets building recall confidence. Pair it with your Sports Harness and Collar for a polished, consistent look.


Why Active Owners Choose It

Durable nylon for long-lasting use

Reflective threading for safety at any hour

Length options to suit training styles (5–15 m)

Perfect for professional or athome training routines

Tags: dog lead

Moist and mouth-wateringly tasty succulent beef. Rich with raw food goodness.

Delicious and nutritious taste with no compromise: 80% beef meat, bone and offal, 20% fresh vegetables and botanicals. Devoured by dogs and loved by owners. If you want your dog to have healthy skin, cleaner teeth and gums, glossy coat, better digestion and strong bones, Benyfit Natural is the only raw dog food you need to feed.

  • 50% Beef with Bone
  • 10% Ox Liver
  • 10% Ox Kidney
  • 10% Ox Heart
  • 9% Carrot
  • 8% Parsnip
  • 3% Broccoli

Moist and mouth-wateringly tasty succulent beef. Rich with raw food goodness.

Delicious and nutritious taste with no compromise: 80% beef meat, bone and offal, 20% fresh vegetables and botanicals. Devoured by dogs and loved by owners. If you want your dog to have healthy skin, cleaner teeth and gums, glossy coat, better digestion and strong bones, Benyfit Natural is the only raw dog food you need to feed.

  • 50% Beef with Bone
  • 10% Ox Liver
  • 10% Ox Kidney
  • 10% Ox Heart
  • 9% Carrot
  • 8% Parsnip
  • 3% Broccoli

Moist and mouth-wateringly tasty succulent beef. Rich with raw food goodness.

Delicious and nutritious taste with no compromise: 80% beef meat, bone and offal, 20% fresh vegetables and botanicals. Devoured by dogs and loved by owners. If you want your dog to have healthy skin, cleaner teeth and gums, glossy coat, better digestion and strong bones, Benyfit Natural is the only raw dog food you need to feed.

  • 50% Beef with Bone
  • 10% Ox Liver
  • 10% Ox Kidney
  • 10% Ox Heart
  • 9% Carrot
  • 8% Parsnip
  • 3% Broccoli

Moist and mouth-wateringly tasty succulent beef. Rich with raw food goodness.

Delicious and nutritious taste with no compromise: 80% beef meat, bone and offal, 20% fresh vegetables and botanicals. Devoured by dogs and loved by owners. If you want your dog to have healthy skin, cleaner teeth and gums, glossy coat, better digestion and strong bones, Benyfit Natural is the only raw dog food you need to feed.

  • 50% Beef with Bone
  • 10% Ox Liver
  • 10% Ox Kidney
  • 10% Ox Heart
  • 9% Carrot
  • 8% Parsnip
  • 3% Broccoli

More from this department

Dibo Free Flow Mince Surf & Turf 1kg

by Dibo

£4.69 available on subscription

Maks Patch Fruit Straws

£0.50 available on subscription

KONG Holiday Wubba Assorted Large

by KONG

£13.00

Betty Miller Liver Bones 500g

£6.00 available on subscription

Bark n Bound

Dog walking Paddocks

Bark n Brush

Meet our Groomers!

You were not leaving your cart just like that, right?

Wait! Don’t Leave Your Cart Behind! 🛍️

You’re so close to getting your items! Complete your purchase now before they’re gone. Need help or advice? We can help you; send us a message: https://rawpetfoodpantry.co.uk/contact/

Chosen delivery method:

Local van delivery

Our own temperature controlled vehicles operate deliveries within a 25 miles radius of our Shedfield store, and will be delivered within 48hrs of placing your order. A minimum spend of £25.00 is required for local van delivery.